|
The MRT1 (initial name) or MRT Sungai Buloh-Kajang Line (interim name) or SBK Line (shortform name) is a new rapid transit line under construction in Klang Valley and the first of three planned lines in the Klang Valley Mass Rapid Transit Project. When completed, the line will be one of the components of the Klang Valley Public Transport System. == Background == The MRT Sungai Buloh-Kajang Line is the first of the three planned Klang Valley Mass Rapid Transit lines to be constructed, with estimated contract value of MYR36 billion. 〔(【引用サイトリンク】 title=MRT )〕 The line starts from Sungai Buloh which is located to the north-west of Kuala Lumpur, runs through the city centre of Kuala Lumpur, and ends in Kajang, a fast developing town located to the south-east of Kuala Lumpur. The line serves a corridor with an estimated population of 1.2 million people.〔(【引用サイトリンク】 title=MRT )〕 Phase One of the MRT Sungai Buloh-Kajang Line from Sungai Buloh to Semantan will become operational by the end of 2016 while Phase Two from Semantan to Kajang will become operational by July 2017, allowing trains to serve the entire line.〔(【引用サイトリンク】 title=MRT )〕 Announced in 2006, the line was initially planned as a LRT at 43 km in length, linking the densely populated areas of Damansara in the northwest and Cheras in the southeast, through the central business district of Kuala Lumpur city.The government then decided to extend the alignment at both ends to Sungai Buloh and Kajang respectively, adding 8 km to the line for a total of 51 km. In addition, the line was changed to an MRT system, with higher capacity trains. The line will be operated by a subsidiary of Prasarana, Rapid Rail when construction is completed. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「MRT Sungai Buloh-Kajang Line」の詳細全文を読む スポンサード リンク
|